Solar System Installation
End-to-end installation of on-grid, hybrid, and off-grid solar systems — residential to industrial.
Our Process
- 1
Site Survey
Roof/ground assessment, shading analysis, load audit, and irradiance measurement.
- 2
System Design
Detailed engineering design: string layout, single-line diagram, equipment selection, and yield simulation.
- 3
Permitting & Procurement
Handling of utility interconnection applications and procurement of certified equipment.
- 4
Installation & Commissioning
Structural mounting, wiring, inverter setup, safety testing, and system power-on.
- 5
Handover & Training
Owner walkthrough, monitoring app setup, and warranty documentation handover.
Related Products
Jinko Tiger Neo 420W TOPCon Panel
420 W TOPCon monocrystalline panel with 22.3% module efficiency and 30-year performance warranty.
SMA Sunny Boy 5.0 String Inverter
5 kW single-phase on-grid inverter with integrated Wi-Fi monitoring and 97.0% peak efficiency.
Victron MultiPlus-II 48V/5000VA Inverter/Charger
5 kVA off-grid / hybrid inverter-charger with PowerAssist and zero-transfer-time switching.